4GCDZ -Gas Cabinet
H2150 x W800 x D800mm
(D1300mm with Ramp)

Description

Please note the price for this product is POA. Please contact the office at the email above.

4 Cylinder Gas Storage Cabinet 4GCDZ
(max cylinder diameter 300mm)

Weatherproof construction and vandal-proof, also maintenance-free with optional extras available.

  • Overall Dimensions: H2150 x W800 x D800mm (1300mm with ramp)
  • Access: Single opening hinged mesh door with sliding bolt locking
  • mechanism – fully pad-lockable.
  • Tare Weight: 197 Kg

This unit is specifically designed to provide a safe, ergonomic range of compliant storage solutions for gas cylinders.

  Additional Information

  • Designed and manufactured in accordance with the BCGA (Guidance for the storage of Gas Cylinders in the workplace).
  • Full structural certification and a 10-year structural warranty available.
  • All cylinders are stored upright and secured with chain restraints.
  • Open mesh panels are used to prevent the accumulation of harmful/explosive gases.
  • Cylinders of incompatible gases can be stored in the same store by employing a fire-rated segregation wall.
  • Empty cylinders can be segregated from full containers and are clearly labelled.
  • If stored externally, weather-proof roofing is required to protect cylinder fittings from rainwater.
  • Raised flooring should also be used to protect the cylinder from corrosive bases &  groundwater erosion.

  Features: Gas Cylinder Stores

  • Heavy-duty steel construction
  •  Option of sliding or hinged access doors – fully lockable.
  • Mesh gates and ventilation panels ensure adequate ventilation and prevent the build-up of potentially explosive gas leaks.
  • Non-slip galvanised floor & ramp
  • Firewalls supplied where required
  • Full range of sizes to suit all cylinder sizes and applications
  • All units have fixed arms and retaining chains to prevent accidents and ensure maximum use of space
  • Delivered to site fully assembled
  • Units can easily be relocated with fork trucks
  • No site works are required